المصدر الرسمي ↗ English

Abu Dhabi Occupational Safety and
Health System Framework
(ADOSH-SF)
Code of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1
February 2026

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 2 of 36
Table of Contents
1. Introduction ....................................................................................................................................................... 3
1.1 Objectives ................................................................................................................................................ 3
1.2 Submission and Approval ................................................................................................................... 4
1.3 OSH-CMP Content ................................................................................................................................ 4
2. Training and Competency ............................................................................................................................. 5
3. Requirements .................................................................................................................................................... 6
3.1 OSH-CMP Content ................................................................................................................................. 7
4. References ....................................................................................................................................................... 33
5. Document Amendment Record ................................................................................................................. 34

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 3 of 36
1. Introduction
(a) This Code of Practice (CoP) applies to all employers within the Emirate of Abu Dhabi.
This CoP is designed to incorporate requirements set by APDHC and Sector Regulatory
Authorities in the Emirate of Abu Dhabi.
(b) This CoP establishes the minimum requirements and standards for the development
and implementation of an OSH Construction Management Plan (OSH-CMP). The
development and implementation of an OSH-CMP helps to ensure that construction
projects consider all OSH hazards and aspects, in accordance with the requirements of
all applicable legislation within the emirate of Abu Dhabi, in particular those outlined
in the
ADOSH-SF.
(c) The OSH-CMP is a site-specific plan developed to ensure that appropriate OSH
management practices are developed, implemented and monitored during the
construction phase of a project.
(d) Principal Contractor (PC) when used in this CoP refers to the main contractor
overseeing and responsible for activities undertaken on the site within the Building
and Construction Sector. Refer to
ADOSH-SF – Mechanism 9.0 – Notification of Principal
Contractor for Construction Work.
1.1 Objectives
(a) Based on the risk or complexity of the project, the Building and Construction SRA shall
decide what level of detail is required in the OSH-CMP for the project. The client will
be informed of the submission requirements at the time of applying for the building
permit.
(b) The objectives of the OSH ‘Construction Management’ plan are as follows:
(i) implement practical effect the commitment to OSH and set the initial framework
for the Safety and Health Management System;
(ii) ensure maximum flexibility in meeting requirements whilst complying with the
relevant standards of the ADOSH-SF Requirements;
(iii) ensure a systematic approach to management of Safety and Health;
(iv) manage risk associated with the construction activities;
(v) establish training programs for all staff and operatives appropriate to task, role
and the project requirements;
(vi) provide a structure to ensure that Safety and Health issues are effectively
managed in a consistent and integrated manner;
(vii) ensure appropriate control and co-ordination of all parties to the construction
phase of the project with regard to Safety and Health;
(viii) generate a culture where everyone, irrespective of their position, understands
that they have a part to play in ensuring that incidents and ill health are
prevented; and
(ix) ensure a safe workplace for all those who work on the project.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 4 of 36
1.2 Submission and Approval
(a) The client will be informed, at the time of applying for a building permit with the
relevant municipality, the level of OSH-CMP that is required for the project.
(b) The level of the plan required will be based upon the risk and complexity of the project.
(c) The client will be informed at the time of application, the submission requirements
and relevant timescales for review and approval.
1.3 OSH-CMP Content
(a) The content of an OSH-CMP shall vary by project, as the size and scope of a
construction project varies. The table under Section 3.1 below indicates which
elements are required for all projects (Table Sections 1-4) and which are only required
if the relevant hazard / impact is present through the construction activities (Table
Section 5).
(b) Table Sections 1-4 shall be included in all OSH-CMP’s as they outline the project
specific management systems and control measures that shall be required for every
project. Table Section 5 identifies some of the more common hazards or impacts that
may be present on projects. This list is not intended to be exhaustive, and it is the
responsibility of the PC who is developing or submitting the OSH-CMP to ensure that
all hazards and impacts are identified and appropriate control measures are included
and developed.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 5 of 36
2. Training and Competency
(a) Employers shall ensure that OSH training complies with the requirements of:
(i)
ADOSH-SF – Element 5 – Training, Awareness and Competency.
(ii)
ADOSH-SF – Mechanism 7.0 – Occupational Safety and Health Practitioner and
Service Provider Registration.
(b) Employers shall ensure employees and other persons required to implement the
requirements of this CoP, or those who have a direct role in the management,
supervision or monitoring of the requirements of this CoP are trained and competent
to fully understand the requirements.
(c) The requirements for specific training needs within the project are discussed within
Section 3.1 (Table Section 4.6.)
(d) Employers shall maintain a record of the required training that contains the following
information:
(i) name and ID number;
(ii) Emirates ID number;
(iii) subject(s) of training;
(iv) training provider;
(v) date(s) of training; and
(vi) person(s) providing the training.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 6 of 36
3. Requirements
(a) Section 3.1 1 below outlines the minimum requirements that must be included in all
OSH-CMP’s that are developed and submitted to the SRA for approval.
(b) The table provides information on the project specific requirements that shall be
included within the plan.
(c) Where an entity has an approved OSH MS under decree 42 of 2009, reference can be
made to their approved OSH MS to avoid duplication within the OSH-CMP.
(d) The table also provides information on the
ADOSH-SF compliance requirements. The
Principal Contractor shall ensure that the plan meets all relevant requirements as
described within the
ADOSH-SF.
(e) It is the responsibility of the Principal Contractor to ensure that all legal requirements,
including local and federal requirements are met when developing the OSH-CMP.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 7 of 36
3.1 OSH-CMP Content
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Section One – Project Details
1.1 Project Details
This section shall include, at a minimum:
• name/title of the project or industry;
• client’s name, and contact information.
• consultant’s name, contact information, and Qudorat
Registration Number;
• name and contact information for other members of
the design team;
• approved PC name and contact information;
• name and contact information for other sub-
contractors; and
• other relevant personnel and contact details.
N/A
Section Two – Document Control
2.1 Document Control
• The initial issue date of the OSH-CMP;
• A record of ongoing issue;
• A mechanism to record subsequent changes;
• A mechanism to record the persons who have been
briefed on the plan and confirmation of their
understanding; and
• Distribution list.
ADOSH-SF-
Element 9

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 8 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Section Three – Project Description
3.1
Project Description
Location
• This section shall include a
general description of the
location and environment at the
project site and surrounding area.
It shall also provide maps that
show the geographic location of
the project area and
surroundings. Maps shall include
all necessary information, such as
key, scale, north arrow, legend,
location of sensitive receptors,
and distance to sensitive
receptors.
3.2 Scope
• This section shall include a
discussion of the objectives and
scope of the construction project.
For example, if activities will be
conducted in separate phases,
and the OSH-CMP is being
submitted only for one particular
phase of the development, then
this section shall describe those
activities to be addressed by this
specific plan.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 9 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
3.3 Project
Schedules and
Milestones
• This Section shall include an
anticipated schedule for the
project, including a proposed
completion date for construction
and the main anticipated
milestones. If the construction
phase includes different phases
or stages, a proposed schedule
for each phase within the overall
project must be provided.
• It shall also include the hours
when construction activities will
take place outside typical work
hours and any restrictions that
may be in place.
• It shall also include anticipated
manpower requirements, linked
to the phasing of the project.
Section Four – Project OSH Management
The OSH Management section of the OSH-CMP shall include information regarding the overall OSH
management of the project, specific to the issues identified below. Each section shall include as a minimum a
site specific policy/procedure on how the issues are going to be managed and controlled.
4.1 OSH Policy and
Management
• Shall include a commitment towards continual
improvement.
• Demonstrates how senior management will lead by
example.
• Contains commitment to comply with applicable
legislation.
• Signed by senior management.
ADOSH-SF-
Element 9
4.2 Roles and
Responsibilities
• This section shall include the roles and responsibilities
of personnel identified within the project organogram.
• Each role identified shall have defined responsibilities
and accountabilities with regards to OSH.
ADOSH-SF -
Element 01

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 10 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.3 OSH Legal
Requirements
General
• This section shall detail the
legal requirements to be
adhered to and shall include
the following information:
o a listing of the applicable
OSH regulations with which
the proponent will comply;
this list shall include
Federal, Emirate and
International Standards
and/or Agreements; and
o a listing of any applicable
OSH Standards, such as
ambient noise levels, air
quality or water quality.
The OSH-CMP shall also
clearly define the
Standards.
ADOSH-SF -
Element 3
Regulatory
Authorities /
Agencies
• This section shall identify each
regulatory agencies and their
role that have an interest in the
project and how that
interaction will be managed.
Interested Parties
• This section shall identify:
o all other interested parties
relevant to the project.
These could include other
projects / facilities nearby
that the construction
activity may impact upon or
residential areas; and
o each interested party and
also the nature of the
interest and how this will
be managed.
ADOSH-SF -
Element 7
ADOSH-SF -
Element 3

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 11 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.4 Management of
Contractors
Selection and
Appointment
• This section shall identify the
procedures that will be utilized
to ensure a systematic
approach to the selection and
appointment of contractors
onto the project.
• This section shall identify the
key roles and responsibilities
for the selection and
appointment of contractors.
The procedure shall ensure that
all contractors have been
reviewed with regards to their
competency to complete the
roles they are being appointed
to undertake and have
appropriate resources, both in
terms of financial and
personnel to competently and
safely deliver the task(s). The
review shall include, but not
limited to, OSH.
ADOSH-SF -
Element 3
Ongoing
Management
• This section shall include
procedures for the ongoing
management of contractors,
including formal reviews of
performance and reporting.
• The procedures shall clearly
define expectation and
timelines for reporting.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 12 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.5 OSH Risk
Management
Risk Management
Procedures
• This section shall include the
specific risk management
procedures for the project. The
procedures shall be specific to
the project and include roles
and responsibilities for all key
stakeholders. The procedure
shall define the methods that
shall be used to identify
hazards and impacts, how
these shall be assessed and
subsequently managed. The
procedure shall also define the
mechanisms for approval along
with project specific levels of
authority.
• The procedure shall also
include mechanisms to ensure
that no activities can be
undertaken without prior
approval from relevant
stakeholders, of the specific
risk assessment(s) and method
statement(s).
ADOSH-SF -
Element 2
ADOSH-SF -
Element 7

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 13 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Project Risk
Register
• This section shall ensure that
an overall project risk and
impact management plan is
developed that incorporates all
foreseeable hazards and
impacts for the project,
including those that are
generated through the
activities of sub-contractors or
other persons on the project.
• The Risk and Aspects Register
shall include reference to
method statements that are
developed as part of the
control measures to reduce the
risk or impact.
• Information on the specific
control measures that are to be
implemented for any activity
that has been defined as
medium or high risk / impact
following the completion of a
robust risk assessment shall be
included within this document.
Sub-Contractor
Risk Assessments
and Method
Statements –
Review and
Approval Process
• The PC shall also ensure that a
review and approval procedure
is in place for risk assessments
and method statements
developed by sub-contractors
or other parties involved on the
project.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 14 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Design Risk –
Identification and
Control
• A procedure is required to
monitor the stages of design to
ensure that OSH is considered
during the process. The
procedure shall include control
measures and mechanisms to
demonstrate that OSH has
been considered. The plan shall
include ongoing mechanisms
that will monitor the design
and risk management
procedures.
• The PC shall ensure that a
robust coordination and
communication procedure is in
place to manage any changes
to the design during the
construction phase.
• The PC shall ensure that any
hazards applicable to the
construction or end use of the
building, related to design are
communicated and raised to
the client / lead designer.
ADOSH-SF -
Element 2
ADOSH-SF -
Element 7
ADOSH-SF –
CoP 20.0
ADOSH-SF –
CoP 53.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 15 of 36
4.6 Training and
Awareness
Project Specific
Training and
Awareness
• This section shall include
information on what the project
specific training and awareness
requirements are. These shall
include all general
requirements for each
individual role, including
induction and life safety
training, along with any specific
training that the role may
require, such as harness
training for work at height.
Included within the plan will be
information on;
o a description of the OSH
awareness and training
program for personnel,
contractors, and
subcontractors needed to
comply with control
measures contained within
the OSH-CMP;
o identification of training
needs, including general
knowledge of the OSH-CMP
and activity-specific needs
for different activities (eg,
the handling of hazardous
waste, working at height,
operation of certain
equipment);
o identification of the
methods that shall be used
to disseminate the
information required and
what the frequencies shall
be; and
o established procedures for
maintaining records of all
training to be performed,
including the name of the
person trained, the date of
training, the name of the
trainer, and a description of
the training content.
ADOSH-SF –
Element 5

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 16 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Induction Training
• This section shall include a
specific section on the
induction program for the
project. The information shall
include, but not limited to;
o information that shall be
included within the
induction training;
o procedures for ensuring
that all persons that enter
the site receive induction
training, including visitors,
contractors and office
based staff;
o procedures for updating
the induction program; and
o refresher training and
intervals.
Toolbox Talks
• This section shall include
specific information on the
development and delivery of
toolbox talks throughout the
lifecycle of the project. Toolbox
talks shall be delivered to all
employees at least once per
week and shall be subject
specific to the project. They
shall also include information
relevant to the works ongoing
at the time. The procedure shall
also include mechanisms for
the recording of attendance at
toolbox talks.
• The toolbox talks shall be
delivered by persons
competent and shall be in a
language appropriate to the
workforce.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 17 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.7 OSH Incidents
Investigation
Procedures
• This section shall include
procedures to ensure that all
incidents are investigated by
competent persons and
appropriate remedial actions
identified. The procedures shall
include the monitoring and
review of all incident and
incident reports from sub-
contractors or other parties
involved on the project.
ADOSH-SF –
Mechanism 11.0
Incident Reporting
• This section shall include
project specific OSH incident
notification and reporting
procedures, including
timescales (internal and
external) and responsibilities.
These shall also incorporate
external reporting to any
relevant authorities.
• It shall also include specific
internal procedures to ensure
that all OSH incidents are
reported and fully investigated.
Hazard and Near
Miss Reporting
• This section shall include a
procedure that requires all
employees to report hazards
and near misses on the project.
4.8 Consultation and
Communication
Employee /
Workforce
Involvement
• This section shall identify how
the workforce will be fully
involved in the management of
OSH, ensuring that the views of
the workforce are considered
and incorporated where
appropriate.
• Employees shall be allowed to
communicate their views and
complaints within the project
OSH Committee Meeting.
ADOSH-SF –
Element 4

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 18 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
OSH Meetings
• This section shall include
information on what OSH
meetings will be held during
the project lifecycle, including;
o a list of all planned OSH
meetings;
o planned attendees;
o frequency;
o Terms of Reference; and
o suggested agenda(s).
Internal & External
Communications
• This section shall identify how
internal and external
communications shall be
managed on the project
including;
o internal communication at
various levels and
functions of the entity;
o communication with
contractors and other
visitors to the workplace;
and
o receiving, documenting and
responding to external
communication sources.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 19 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Consultation
• This section shall identify how
consultation with all relevant
parties will be managed and
controlled, including activities
such as;
o participation and
consultation activities (eg.
OSH Committee);
o appropriate involvement in
hazard identification, risk
assessment and
determination of controls;
o appropriate involvement in
incident investigation;
o involvement in the
development and review of
OSH policies and
objectives;
o consultation in changes
that affect OSH (including
Contractors); and
o employee representation
on OSH matters.
• A procedure to receive and
address complaints from
external parties.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 20 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Site OSH Notice
Board
• The PC shall set up and
maintain safety notice boards
at appropriate, prominent
locations. These notice boards
shall be located in positions
that are clearly visible to the
Contractor’s employees and
anyone entering the work
place. Safety signs shall be
selected that describe the
appropriate hazards and
relevant emergency contact
information and shall be in
Arabic, English, and the other
most common languages of the
workforce. All persons shall be
made fully aware of the safety
signs and the emergency
contact information, prior to
commencing work on site.
• A nominated person shall
maintain the Main OSH Site
notice boards that shall contain
as a minimum:
o Construction License
(within 1 year);
o Notification of the PC;
o Project Directory;
o OSH Policy Statements;
o Incident Reporting
Procedure;
o Action in the event of
Major Incident Notice;
o Site emergency and
evacuation Plan;
o Visitors Notice;
o Site Rules; and
o Lost Time Injury Rate (as
per
ADOSH-SF)
ADOSH-SF –
Element 4
ADOSH-SF –
CoP 17.0
ADOSH-SF –
CoP 53.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 21 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.9 Monitoring,
Inspection and
Auditing
General
• This section shall include, but
not be limited to, information
regarding the monitoring and
auditing of OSH performance,
as well as information on
reporting requirements, OSH
checklists, and monitoring
review, as discussed below.
ADOSH-SF –
Element 8
Internal Audit and
Inspection
• This section shall detail what
the specific internal audit and
inspection procedures are for
the project (including
contractors) and how these will
be implemented. The procedure
shall include as a minimum;
o types of audits and
inspections;
o roles and responsibilities;
and
o frequencies.
Non Conformance
and Corrective
Action
• The procedure shall include, but
not be limited to:
o identifies responsible
personnel for the review of
monitoring audits and
compliance inspections; and
o establishes procedures,
including timelines, for
responding to non-
compliance findings from
these audits and
inspections;

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 22 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
OSH Monitoring
Requirements
• This section shall include
information about monitoring
requirements for OSH
performance. Including as a
minimum the following:
o discuss how identified
hazards and impacts will be
monitored, including the
indicators to be measured,
the methods to be used,
the sampling locations,
frequency of
measurements, detection
limits, the thresholds that
trigger corrective actions,
and the party who will
conduct monitoring;
o provide procedures that
indicate corrective actions
for non-compliance with
monitoring targets,
specifying notification
requirements to
responsible personnel and
the time frames for
notification and for
corrective actions to be
performed;
o identify the frequency and
content of monitoring
reports for internal use and
those required to be
submitted to relevant
authorities for review; and
o ensure that the monitoring
activities and reports
comply with all relevant
authorities’ guidelines
including health
surveillance.
ADOSH-SF –
Element 7

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 23 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
OSH Reporting
Requirements
• The OSH-CMP shall outline
procedures for reporting
requirements, including the
frequency and content of
required reports, such as the
following:
o Pre-operation compliance
reports;
o Incident reports;
o Periodic or annual
performance reports;
o Auditing reports;
o Non-compliance reports;
o Corrective action reports;
o Complaints management
reports; and
o Any special reports
required by government
agencies.
ADOSH-SF –
Element 7
4.10 OSH-CMP Review
and Update
• This section shall establish procedures for the periodic
review of the OSH-CMP to ensure that the plan’s
contents are correct and that it is being appropriately
implemented.
• These reviews will ensure that, shall conditions arise
that alter the plan’s contents or requirements — the
OSH-CMP remains updated to reflect these changes.
• This shall include, but not limited to:
o demonstrate how the proponent intends to keep
the OSH-CMP as a “live” document, capable of
modification during the project’s life cycle and as
circumstances dictate;
o indicate who will regularly review, update, and
develop the OSH-CMP as construction progresses;
and
o outline procedures for the periodic review of the
OSH-CMP to ensure that its contents are correct
and that it is being appropriately implemented.
ADOSH-SF –
Element 9

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 24 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
4.11 OSH File
• An OSH file shall be developed for the project and shall
be handed over to the client upon practical completion
of the project.
• The OSH file may form part of the Operation and
Maintenance (O&M) manuals developed for the project.
• The OSH file shall be developed in line with the project
phasing and shall be reviewed on a continual basis by a
competent person. The minimum contents for the OSH
File shall include;
o a brief description of the work carried out;
o residual hazards and how they have been dealt
with;
o project directory listing all key parties involved in
the project;
o key structural principles incorporated in the design
of the structure (for example bracing, sources of
substantial stored energy – including pre or post
tensioned members) and safe working loads for
floors and roofs;
o any hazards associated with the materials used;
o information regarding the removal or dismantling
of installed plant and equipment;
o OSH information about equipment provided for
cleaning or maintaining the structure;
o the nature, location and markings of significant
services, including fire-fighting services; and
o information and as-built drawings of the structure,
its plant and equipment.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 25 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Section – Five – Project Specific Information
As part of the OSH-CMP the plan shall include procedures for managing and mitigating risk, which may include,
but not be limited to, the elements described in the following subsections. The plan shall thoroughly address
site-specific control measures for the applicable OSH components. Note that it is not sufficient to solely
provide a list of reasonably practicable control measures that will be used at the contractor’s or subcontractor’s
discretion; the OSH-CMP must include control measures that will be performed and that can be audited to
determine their effectiveness.
5.1 Site Security Plan
and Access Control
• This section shall define what the security risks for the
project are and how these will be controlled and
managed. As a minimum the plan shall discuss;
o control of the boundary of the project;
o access and egress points;
o crowd control;
o security checks;
o visitor control; and
o shift work and control of night work.
5.2 Project Permit to
Work Procedures
• This section shall detail what arrangements the PC
shall implement to control the issue and management
of internal permits and authorizations.
• The PC shall ensure that one permit and authorization
procedure is implemented for the entire project and all
other parties adhere to this requirement.
ADOSH-SF – CoP
21.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 26 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.3 Traffic
Management Plan
The Traffic Control Plan shall:
• Outline control measures to minimize the impacts on
local traffic from the construction activities.
• Discuss the control measures to minimize traffic
disturbances and associated impacts from noise.
• Identify access roads for construction vehicles and
safety control measures used for pedestrian access
and crossings.
• Describe the procedures for public notification of any
anticipated traffic-related concerns, such as street
closings.
• Discuss how traffic will be managed within the project,
ensuring;
o one way traffic systems are implemented as far as
reasonably practicable;
o reversing is prohibited unless under competent
supervision;
o loading and drop off areas are clearly defined and
manageable;
o appropriate access is available at all time for
emergency access;
o ongoing review in line with the project phasing;
o project parking and control;
o delivery timings and applicable restrictions;
o vehicle maintenance and wash-down; and
o segregation of pedestrians and traffic.
ADOSH-SF – CoP
25.0
ADOSH-SF – CoP
44.0
ADOSH-SF – CoP
53.0
5.4 Material Storage
Plan
• This section shall define how the materials required for
the project will be stored within the project premise
and shall account for the phasing of the project.
• If materials are to be stored on floor slab(s) the floor
loadings must be calculated and displayed.
• The plan shall also consider the need to access the
materials, in line with the project phasing.
ADOSH-SF – CoP
44.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 27 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.5
Identification and
Management of
Asbestos and
other Hazardous
Materials /
Substances
• This section of the plan shall detail the procedures in
place to identify Asbestos Containing Materials (ACMs)
and other hazardous materials/substances and
hazardous waste materials that may be present.
ADOSH-SF – CoP
1.1
5.6 Site Safety Rules
• The PC shall develop and control a minimum set of site
safety rules that shall be followed by all persons
entering the site. These shall be displayed at the
entrance to the site and at locations across the project.
5.7
Emergency
Management
(Including First
Aid)
• The PC shall develop procedure to manage any
emergency situations that may arise on the project.
The procedure shall include information on the
identification of emergencies.
• The procedures shall also include the provision of first
aid and medical facilities on the project.
• Emergency procedure shall include firefighting
arrangement, assembly points, as well as notification &
reporting procedure to management & local authorities
ADOSH-SF – CoP
4.0
ADOSH-SF –
Element 6
5.8 Manual Handling
Operations
• This section shall define the arrangements that will be
implemented to control any hazards and risks that
arise from manual handling operations within the
project.
• All persons that are engaged on the project shall
receive manual handling training that is specific to
their role and undertakings. The training shall be
refreshed on a regular basis.
ADOSH-SF – CoP
14.0
5.9 Working at Height • This section shall identify what the arrangements are
for controlling work at height.
ADOSH-SF – CoP
23.0
5.10
Fixed and
Temporary
Electrical
Installations
• The section shall include information on how the PC
will control fixed and temporary electrical Installations.
• PC shall arrange all temporary installations with 110
volts power supply. For other devices which require
high voltage PC shall prepare procedures including
permit to work requirements and certified competent
personnel
ADOSH-SF – CoP
15.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 28 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.11 Personal
Protective
Equipment
• The PC shall implement mechanisms to ensure that all
persons who enter the site, including office employees
and visitors have basic PPE.
• The PC shall develop a procedure to manage all PPE
requirements for the project and shall ensure that all
sub-contractors or other parties including the project
team adhere to this procedure.
ADOSH-SF – CoP
2.0
5.12 Plant and
Equipment
• This section shall define the arrangements that the PC
will implement to control all Plant and Equipment that
is to be used on the project. Plant and equipment shall
also include portable power tools and hand tools. This
shall also include shared plant and equipment.
ADOSH-SF – CoP
35.0
ADOSH-SF – CoP
36.0
ADOSH-SF – CoP
47.0
ADOSH-SF – CoP
51.0
5.13 Housekeeping
Arrangements
• This section shall include information on how the PC
shall ensure appropriate housekeeping standards on
the project. This shall include, where relevant,
information on the separation of waste and
appropriate storage. Information shall be included on
the number of operatives that will be allocated to
housekeeping duties.
ADOSH-SF – CoP
8.0
5.14 Lifting Equipment
and Lifting
Operations
• This section shall include information on how the PC
will control lifting operations and lifting equipment on
the project. This will include ensuring any independent
testing and certification is in place prior to lifting being
undertaken.
• The procedure shall include mechanisms for the review
and approval of lifting plans prior to any lifts being
undertaken.
ADOSH-SF – CoP
34.0
5.15 Welfare and Site
Accommodation
• This section shall include information on how the PC
will control and manage all site welfare and
accommodation.
ADOSH-SF – CoP
18.0
Existing Structures
/ Structural Issues
• This section shall highlight what, if any, the impact of
the works will be on any existing structure or any
structural issues and how this will be controlled.
5.16 Scaffolds and
Ladders
• This section shall include information on how the PC
shall ensure the safe erection, use, maintenance of all
scaffold and ladders on the project.
ADOSH-SF – CoP
22.0
ADOSH-SF – CoP
37.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 29 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.17 Cantilevers and
Platforms
• These sections shall identify the procedures that will
be implemented to ensure safety, in line with the
applicable regulatory requirements.
5.18 Formworks and
Structures
ADOSH-SF – CoP
40.0
5.19 Roofs
ADOSH-SF – CoP
23.0
5.20 Excavations and
Trenches
ADOSH-SF – CoP
29.0
5.21 Confined Spaces
ADOSH-SF – CoP
27.0
5.22 Demolition and
Decommissioning
ADOSH-SF – CoP
53.0
5.23 Piling
ADOSH-SF – CoP
46.0
5.24 Electrical and Gas
Welding
ADOSH-SF – CoP
21.0
ADOSH-SF – CoP
28.0
ADOSH-SF – CoP
49.0
5.25 Gas Cutting
5.26 Working over or
Adjacent to Water
ADOSH-SF – CoP
31.0
5.27 Mobile Equipment
ADOSH-SF – CoP
36.0
5.28 Portable Tools
ADOSH-SF – CoP
35.0
ADOSH-SF – CoP
36.0
5.29 Falling Objects
ADOSH-SF – CoP
22.0
ADOSH-SF – CoP
23.0
5.30 Slips Trips and
Falls
ADOSH-SF – CoP
8.0
5.31 Animals and
Reptiles
5.32 Workplace Bullying
and Violence
ADOSH-SF – CoP
13.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 30 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.33 Impacts / Hazards
from Adjacent
Activities
• This section of the plan shall detail any impacts that
may arise from activities on or adjacent to the site
during construction. These activities may include;
o partial occupation / use of the building / facility
during construction;
o nearby schools / playgrounds;
o retail malls / shops;
o use of hazardous materials nearby;
o other construction activities; and
o surrounding land use.
ADOSH-SF –
Element 2
5.34 Temporary Works
• The PC is responsible for the safe construction and use
of all Temporary Works conducted on all projects they
control, regardless of whether they are carried out by a
contractor.
• Temporary Works must:
o be designed and the design must be checked;
o the physical works must be inspected to
demonstrate compliance with the design;
o all checks and inspections must be recorded in
writing and be demonstrable; and
o all changes must be referred to the designer and
checker.
ADOSH-SF –
Element 2
ADOSH-SF – CoP
43.0
ADOSH-SF – CoP
20.0
5.35 Existing Services
• The PC must allow for making all enquiries, giving all
notices, locating, protecting, upholding and
maintaining all existing live mains and services under
or over the site including providing all necessary
temporary support and diversions.
ADOSH-SF – CoP
39.0
5.36 Services
Coordination
• This section of the plan shall set out the arrangements
that will be implemented to ensure safety when
working on, or adjacent to, live services. These
arrangements may be issued as a procedure / site
instruction or included as an appendix and referenced
herein.
ADOSH-SF – CoP
39.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 31 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
5.37 Occupational
Health
Arrangements
Noise and
Vibration
• This section shall outline control
measures to minimize the impacts on
local noise levels and vibrations from
the construction activities and shall
accomplish the following:
o identify the appropriate noise
suppression or abatement control
measures required to ensure that
ambient noise level
concentrations do not exceed
established limits for both
employees on site and for nearby
receptors;
o identify any restrictions – eg.
working hours where noisy works
cannot be undertaken;
o discuss the control measures that
will be employed to minimize
vibration and the procedures that
will be used to notify potentially
impacted receptors about these
operations; and
o where applicable, personal
vibration hazards shall be
considered.
ADOSH-SF – CoP
3.0
ADOSH-SF – CoP
3.1
Temperatur
e and Heat
Stress
• This section shall identify the
arrangements to manage heat stress
and working in high temperatures.
ADOSH-SF – CoP
11.0
Radiation
(Ionizing
and Non-
ionizing
Radiation)
• This section shall identify how the PC
shall identify all sources and what
control measures shall be
implemented.
Lighting
and
Ventilation
• This section shall identify the
procedures that will be implemented
to ensure safety, in line with the
applicable regulatory requirements.
ADOSH-SF – CoP
8.0
Biological
Agents
• This section shall identify how the PC
shall identify all sources and what
control measures shall be
implemented.
ADOSH-SF – CoP
1.0

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 32 of 36
No. Topic OSH-CMP Project Specific Requirements
ADOSH-SF
Compliance
Reference
Pest(s)
• This section shall identify the
procedures that will be implemented
to ensure safety, in line with the
applicable regulatory requirements.
ADOSH-SF – CoP
8.0
Health
Surveillance
and
Managemen
t Plan
• This section shall detail any site
specific health surveillance programs
that are to be developed for the
project. These plans shall be above
the normal medical procedures that
are required for all projects and shall
be in response to specific health
hazards on the project.
ADOSH-SF – CoP
5.0
ADOSH-SF – CoP
9.0
5.38 Waste / emission
Arrangements
Waste
Managemen
t Plans
• The PC shall develop plans to ensure
all projects waste are managed and
disposed of correctly, including:
o Segregation, minimization, reuse
and recycling;
o solid waste management;
o liquid waste (effluent)
management;
o hazardous waste management;
and
o use of approved Service Providers.
ADOSH-SF – CoP
54.0
Air Pollution
Protection
• Dust emissions / suppression
program.
• Air emissions.

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 33 of 36
4. References

L144 – Managing Health and Safety in Construction – HSE Books - ISBN 978 0 7176
6223 4

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 34 of 36
5. Document Amendment Record
Version Revision Date Description of Amendment
Page/s Affected
4.0
15th July 2024
System acronym updated from OSHAD-SF
to ADOSH-SF to accurately reflect
document title
Throughout
Change from OSHAD to ADPHC
Change of Logo
Minor editorial changes throughout the
document without changing requirements.
Title of Mechanism 7.0 updated to ADOSH-
SF – Mechanism 7– Occupational Safety
and Health Practitioner and Service
Provider Registration
OSHAD-SF - Mechanism 8.0 - OSH
Practitioner Registration deleted
4.1
16th February
2026
Minor editorial changes throughout the
document without changing requirements. Throughout

ADOSH-SF – Codes of Practice
CoP 53.1 – OSH Construction Management Plan
Version 4.1 – 16th February 2026
Page 35 of 36

نص غير رسمي مُستخرج من وثائق عامة؛ لا يُضمن التنسيق أو الاكتمال. يُرجى التحقق من المصدر الرسمي. في حال التعارض، يسود النص العربي. لا يُعد استشارة قانونية. المصدر الرسمي ↗