Abu Dhabi Occupational Safety and
Health System Framework
(ADOSH-SF)
Mechanisms
Mechanism 9.0 – Appointment of Principal
Contractor for “Construction Work”
Version 4.0
July 2024

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 2 of 14
Table of Contents
1. Introduction ...................................................................................................................................................... 3
2. Requirements .................................................................................................................................................. 4
2.1 Appointment of Principal Contractor ................................................................................................ 4
2.2 Review and approval of OSH Plan ..................................................................................................... 4
3. Document Amendment Record ................................................................................................................. 6
Appendix 1: Appointment of Principal Contractor Flowchart ................................................................. 7
Appendix 2: Minimum OSH Requirements for Small Projects ................................................................. 8
Appendix 3: Occupational Safety and Health (OSH) Requirements for Various Building
Permits ...................................................................................................................................................................... 11

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 3 of 14
1. Introduction
This mechanism is designed to define the procedures to be utilized by OSHAD and the Building
and Construction Sector Regulatory Authority (SRA) to manage the appointment of a principal
contractor on sites where “Construction Work” is being undertaken.
This mechanism has been designed to ensure fair, transparent and consistent implementation of
the ADOSH-SF.

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 4 of 14
2. Requirements
2.1 Appointment of Principal Contractor
(a) This mechanism has been developed as part of the ADOSH-SF and describes the
process for nominating and appointing principal contractors for “Construction Work” in
the Emirate of Abu Dhabi.
(b) This mechanism has been developed to regulate the process of appointment of
principal contractors in the Building and Construction Sector.
(c) The Building and Construction SRA will administer and enforce the appointment
process as part of the Municipal Electronic Permitting System (MEPS).
(d) The aim of this mechanism is to regulate the process for the appointment of an
appropriate entity to perform this important role.
(e) Developers / Clients shall appoint a principal contractor, using Form 2a Appointment
& Undertake of Contractor Office or Form 2b Appointment and Undertaking of EPC
Contractor Office, in the Municipal Electronic Permitting System (MEPS).
2.2 Review and approval of OSH Plan
(a) Principal contractor shall develop the applicable OSH requirements (OSH Plan,
Demolition / Decommissioning Plan, or Risk Assessments) based on the requirements
of Appendix 3, Occupational Safety and Health (OSH) Requirements for Various
Building Permits, and submit it to the supervision consultant for review and approval.
(b) OSH plan shall be project specific and developed based on ADOSH-SF - CoP 53.1 OSH
Construction Management Plan.
(c) Demolition/decommissioning plan shall be project specific and developed based
ADOSH-SF - CoP 53.0 OSH-Management during Construction Work.
(d) Risk assessment(s) shall be developed to include all activities that will be performed
under the building permit & shall be based on OSHAD SF – Element 2 – Risk
Management, and ADOSH-SF – TG - Process of Risk Management.
(e) The supervision consultant shall review the submission (OSH Plan, Demolition /
Decommissioning Plan, or Risk Assessments) for completeness and either approve or
reject it accordingly.
(f) The Consultant / Principal contractor shall upload the OSH document through MEPS.
(g) The B&C SRA within the relevant municipality shall review the OSH attachment based
upon the ADOSH-SF requirements, e.g.
ADOSH-SF - CoP 53.0 & ADOSH-SF - CoP 53.1,
and either approve it with / without comments or reject it and provide comments to
the principal contractor and supervision consultant.
(h) If rejected, the Principal Contractor shall review & amend the OSH attachment based
on the comments received from the B&C SRA.

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 5 of 14
(i) Principal contractor shall submit the amended OSH attachment (OSH Plan, Demolition
/ Decommissioning Plan, or Risk Assessments) to supervising consultant for review
and approval.
(j) The consultant /Principal contractor shall upload the amended documents through
MEPS for review and approval by the B&C SRA.
(k) For building permits that don’t require a full OSH plan or risk assessment, the Principal
Contractor shall comply with the minimum OSH requirements as set out within
Appendix 2, Minimum OSH Requirements for Small Projects.
(l) Appendix 1 sets out the process of the appointment of principal contractor through
the Building and Construction SRA.
(m) Refer to
ADOSH-SF - CoP 53.0 – OSH Management during Construction Work for more
information on the appointment of principal contractors and the obligations of all
relevant stakeholders.

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 6 of 14
3. Document Amendment Record
Version Revision Date Description of Amendment
Page/s
Affected
4.0
15 th July 2024
System acronym updated from OSHAD-SF to
ADOSH-SF to accurately reflect document title
Throughout
Change from OSHAD to ADPHC
Change of Logo
Minor editorial changes to provide further
clarification without changing requirements.
Delete Section 3 (References)
Not
Applicable
From Appendix 2, delete contact details of OSH
offices at the Municipalities
10
Change from Department of Urban Planning and
Municipalities to Department of Municipalities &
Transport
14

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 7 of 14
Appendix 1: Appointment of Principal Contractor Flowchart
Appointment of a Principal
Contractor
Construction Work Only
Developer / Client
• Identify an appropriate entity to be the Principal Contractor
• Assess the proposed Principal Contractor’s OSH MS and OSH resources and ability to perform this
important role (OSHAD -SF – Element 3 – Management of Contractors)
Complete the Developer, Client or Owner details section in the Appointment & Undertake of Contractor
Office Form No. 2a in the Municipal Electronic Permitting System (MEPS)".
Appointment & Undertake of Contractor Office Form No. 2a shall be filled electronically in the MEPS when
applying for the Project Permit (Assign Contractor & Supervisor Consultant Request)".
Principal Contractor
• Complete the Principal Contractor details in the Appointment & Undertake of Contractor Office Form
No. 2a.
• Return the Appointment & Undertake of Contractor Office Form No. 2a/2b to the Developer/Client or
Owner for submittal in the Municipal Electronic Permitting System (MEPS) when applying for the
Project Permit (Assign Contractor & Supervisor Consultant Request) in MEPS.
• If required, develop the OSH requirements attachment applicable to the Project Permit - i.e., either
OSH Plan, Demolition / Decommissioning Plan, or Risk Assessments, as stipulated in Appendix 3.
Then have the attachment reviewed by the Supervisor Consultant and uploaded electronically through
MEPS after submittal of Form No. 2a when applying for the Project Permit (Assign Contractor &
Supervisor Consultant Request).
Building and Construction Sector Regulatory Authority
Review the submitted OSH attachment, matching the principal contractor information with the information
mentioned in Form No. 2a.
Building and Construction Sector Regulatory Authority
• Approve the OSH Attachment (i.e., OSH Plan, Demolition / Decommissioning Plan, or Risk
Assessments)
• Register of projects with approved OSH Attachment is obtained through MEPS.
Building and Construction Sector Regulatory
Authority
Is the submission acceptable?
Relevant Municipality - Monitoring and Inspection Section
Undertake inspections as required for the project
Developer / Client
• Rectify the deficiencies
identified in the submitted
form
• Resubmit to the Building
and Construction SRA
Yes
No

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 8 of 14
Appendix 2: Minimum OSH Requirements for Small Projects
Minimum OSH Requirements for Small
Projects that Don’t Require OSH Plan or Risk
Assessment
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ ﺍﻷﺩﻧﻰ ﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
ﻟﻠﻤﺸﺎ��ﻊ ﺍﻟﺼﻐﻴﺮﺓ ﺍﻟﺘﻲ ﻻ تﺘﻄﻠﺐ ﺧﻄﺔ ﻟﻠﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ ﺃﻭ ﺗﻘيﻴﻢ ﻟﻠﻤﺨﺎﻃﺮ
Date: ﺍﻟﺘﺎ��ﺦ:
Contractor’s Name: ﺍﺳﻢ ﺍﻟﻤﻘﺎﻭﻝ
1 Complete Fence shall be installed and
maintained all the time.
ﻳﺠﺐ تﺜ�ﻴﺖ ﺍﻟﺴﻴﺎﺝ ﺍﻟﻜﺎﻣﻞ ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻪ
ﺑﺸﻜﻞ ﻣﺴﺘﻤﺮ.
1
2 Proper Project Sign Board shall be installed
before starting work on site and shall be
maintained throughout the project with
updated details.
ﻳﺠﺐ تﺜ�ﻴﺖ ﻻﻓﺘﺔ ﺍﻟﻤﺸرﻭﻉ ﺑﺸﻜﻞ ﻣﻼﺋﻢ ﻗﺒﻞ
ﺍﻟﺒﺪء ﻓﻲ ﺍﻟﻌﻤﻞ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻬﺎ
ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ ﻣﻊ �ﻴﺎﻧﺎﺕ ﻣﺤﺪﺛﺔ.
2
3 Updated Permits, NOCs and other Legal
Documents shall be available at site
throughout the project.
ﻳﺠﺐ ﺃﻥ تﺘﻮﻓﺮ ﻓﻲ ﺍﻟﻤﻮﻗﻊ ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ
ﺍﻟﻤﻤﺎﻧﻌﺔ ﻋﺪﻡ ﻭﺷﻬﺎﺩﺍﺕ ﺍﻟﻤﺤﺪﺛﺔ، ﺍﻟﺘﺼﺎ��ﺢ
ﻭﻏﻴﺮﻫﺎ ﻣﻦ ﺍﻟﻮﺛﺎﺋﻖ ﺍﻟﻘﺎﻧﻮﻧﻴﺔ.
3
4 Safety Signs (mandatory PPE, warning,
emergency, etc.) shall be placed and
maintained throughout the project.
ﻳﺠﺐ ﺃﻥ ﻳﺘﻢ ﻭﺿﻊ ﻭﺻﻴﺎﻧﺔ ﻋﻼﻣﺎﺕ ﺍﻟﺴﻼﻣﺔ
ﻭﻟﻮﺣﺎﺕ ﺍﻟﺴﻼﻣﺔ )ﻣﻌﺪﺍﺕ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﺸﺨﺼﻴﺔ
ﻭﻏﻴﺮﻫﺎ( ﻭﺍﻟﻄﻮﺍﺭﺉ ﺍﻟﺘﺤﺬﻳ��ﺔ، ﺍﻹﻟزﺍﻣﻴﺔ،
ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻬﺎ ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ.
4
5 First Aid (first aid box) & Emergency
Arrangements shall be in place throughout
the project including display of Emergency
Contact Nos.
ﻳﺠﺐ ﻟﻺﺳﻌﺎﻓﺎﺕ ﺍﻷﻭﻟﻴﺔ )ﺻﻨﺪﻭﻕ ﺍﻹﺳﻌﺎﻓﺎﺕ
ﺍﻷﻭﻟﻴﺔ( ﻭﺗﺮﺗ�ﺒﺎﺕ ﺍﻟﻄﻮﺍﺭﺉ ﺃﻥ ﺗﻜﻮﻥ ﻣﺘﻮﻓﺮﺓ
ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ، ﺑﻤﺎ ﻓﻲ ﺫﻟﻚ ﻋﺮﺽ ﺃﺭﻗﺎﻡ
ﺍﻻﺗﺼﺎﻝ ﻓﻲ ﺣﺎﻻﺕ ﺍﻟﻄﻮﺍﺭﺉ.
5
6 Proper Welfare Facilities such as toilets,
drinking water, rest area etc. shall be in
place for all workers at all times and shall
be maintained throughout the project.
ﻟﺠﻤﻴﻊ ﺍﻟﻤﻨﺎﺳﺒﺔ ﺍﻟﺮﻋﺎﻳﺔ ﻣرﺍﻓﻖ ﺗﻮﻓﻴﺮ ﻳﺠﺐ
ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﺍﻷﻭﻗﺎﺕ ﺟﻤﻴﻊ ﻭﻓﻲ ﺍﻟﻌﺎﻣﻠﻴﻦ
ﺍﻟﻤرﺍﺣﻴﺾ )ﻣﺜﻞ ﺍﻟﻤﺸرﻭﻉ ﻓﺘﺮﺓ ﻃﻮﺍﻝ ﻋﻠﻴﻬﺎ
ﻭﻣﻴﺎﻩ ﺍﻟﺸﺮﺏ ﻭﻣﻨﻄﻘﺔ ﺍﻟرﺍﺣﺔ ﻭﻏﻴﺮﻫﺎ(.
6
7 Appropriate Fire Extinguishers (min. two
CO2 and two dry powder type) shall be
available on all sites and properly
maintained throughout the project. More
extinguishers shall be in place based on the
size of project, building floors, fire hazards
etc.
)ﻋﻠﻰ ﺍﻟﻤﻨﺎﺳﺒﺔ ﺍﻟﺤ��ﻖ ﻃﻔﺎﻳﺎﺕ ﺗﻮﻓﻴﺮ ﻳﺠﺐ
ﺍﻷﻗﻞ ﺍ�ﻨﺎﻥ ﻣﻦ ﻧﻮﻉ ﺛﺎﻧﻲ ﺃﻛﺴﻴﺪ ﺍﻟﻜﺮﺑﻮﻥ ﻭﺍ�ﻨﺎﻥ
ﻣﻦ ﻧﻮﻉ ﺍﻟﺒﺎﻭﺩﺭ( ﻓﻲ ﺟﻤﻴﻊ ﺍﻟﻤﻮﺍﻗﻊ ﻭﺃﻥ ﻳﺘﻢ
ﺻﻴﺎ�ﺘﻬﺎ ﺑﺸﻜﻞ ﺩﻭﺭﻱ ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ. ﻛﻤﺎ
ﻳﺠﺐ ﺗﻮﻓﻴﺮ ﻃﻔﺎﻳﺎﺕ ﺣ��ﻖ ﺇﺿﺎﻓﻴﺔ ﺑﺤﺴﺐ ﺣﺠﻢ
ﺍﻟﻤﺸرﻭﻉ، ﻭﻋﺪﺩ ﻃﻮﺍﺑﻖ ﺍﻟﻤﺒﻨﻰ، ﻭﻣﺨﺎﻃﺮ ﺍﻟﺤ��ﻖ
ﻭﻏﻴﺮﻩ ﻣﻦ ﻋﻮﺍ ﻣﻞ.
7
8 Basic OSH Induction shall be provided to all
workers before starting the project and
records shall be maintained. Specific
trainings shall be provided to workers
based on hazards.
ﻳﺠﺐ ﺗﻮﻓﻴﺮ ﺍﻟﺘﺪ��ﺐ ﺍﻟﺘﻮﺟﻴﻬﻲ ﺍﻷﺳﺎﺳﻲ ﺑﺸﺄﻥ
ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ ﻟﻜﺎﻓﺔ ﺍﻟﻌﺎﻣﻠﻴﻦ ﻗﺒﻞ
ﺑﺪء ﺍﻟﻤﺸرﻭﻉ، ﻭﺍﻻﺣﺘﻔﺎﻅ ﺑﺎﻟﺴﺠﻼﺕ. ﻛﻤﺎ ﻳﺠﺐ
ﺗﻮﻓﻴﺮ ﺗﺪ��ﺒﺎﺕ ﻣﺘﺨﺼﺼﺔ ﻟﻠﻌﻤﺎﻝ ﻋﻠﻰ ﺃﺳﺎﺱ
ﺍﻟﻤﺨﺎﻃﺮ.
8
9 Basic PPEs like shoes, helmet, & vest shall
be provided and its use shall be strictly
implemented throughout the project. Task
Specific PPEs like hand gloves, ear plugs,
glasses… shall be provided to workers and
training shall be given for its proper use
and storage.
ﻳﺠﺐ ﺗﻮﻓﻴﺮ ﻣﻌﺪﺍﺕ ﺍﻟﺤﻤﺎﻳﺔ ﺍﻟﺸﺨﺼﻴﺔ ﺍﻷﺳﺎﺳﻴﺔ،
ﻭﺍﻟﺴﺘرﺍﺕ، ﻭﺍﻟﺨﻮﺫﺍﺕ ﺍﻟﺴﻼﻣﺔ ﺃﺣﺬﻳﺔ ﻣﺜﻞ
ﻭﻓﺮﺽ ﺍﺳﺘﺨﺪﺍﻣﻬﺎ ﺑﺼرﺍﻣﺔ ﻃﻮﺍﻝ ﻓﺘﺮﺓ ﺍﻟﻤﺸرﻭﻉ.
ﺍﻟﺸﺨﺼﻴﺔ ﺍﻟﺤﻤﺎﻳﺔ ﻣﻌﺪﺍﺕ ﺗﻮﻓﻴﺮ ﻳﺠﺐ ﻛﻤﺎ
ﺍﻷﻳﺪﻱ ﻗﻔﺎزﺍﺕ ﻣﺜﻞ ﺍﻟﻤﺘﺨﺼﺼﺔ، ﻟﻠﻤﻬﺎﻡ
ﻭﺳﺪﺍﺩﺍﺕ ﺍﻷﺫﻥ ﻭﺍﻟﻨﻈﺎرﺍﺕ ﻟﻠﻌﻤﺎﻝ، ﻭﺗﺪ��ﺒﻬﻢ
ﻋﻠﻰ ﻛﻴﻔﻴﺔ ﺍﻻﺳﺘﺨﺪﺍﻡ ﻭﺍﻟﺘﺨ��ﻦ ﺍﻟﻤﻨﺎﺳﺐ ﻟﻬﺎ.
9

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 9 of 14
Minimum OSH Requirements for Small
Projects that Don’t Require OSH Plan or Risk
Assessment
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ ﺍﻷﺩﻧﻰ ﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
ﻟﻠﻤﺸﺎ��ﻊ ﺍﻟﺼﻐﻴﺮﺓ ﺍﻟﺘﻲ ﻻ تﺘﻄﻠﺐ ﺧﻄﺔ ﻟﻠﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ ﺃﻭ ﺗﻘيﻴﻢ ﻟﻠﻤﺨﺎﻃﺮ
10 Safe Access shall be provided to all work
places and maintained at all times. Proper
Housekeeping shall be practiced all the
time (on daily basis). Storage area shall be
provided and maintained. Waste
Management shall be practiced and regular
disposal of waste from site shall be done.
Food waste shall be removed from site in
sealed bags on regular basis.
ﻳﺠﺐ ﺗﻮﻓﻴﺮ ﺍﻟﻤﺪﺍﺧﻞ ﻭﺍﻟﻤﺨﺎ�ﺝ ﺍﻵﻣﻨﺔ ﻓﻲ ﺟﻤﻴﻊ
ﺃﻣﺎﻛﻦ ﺍﻟﻌﻤﻞ ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻬﺎ ﻓﻲ ﺟﻤﻴﻊ
ﻭﺍﻟﺘﻨﻈﻴﻒ ﺑﺎﻟﺘﺮﺗﻴﺐ ﺍﻻﻟﺘزﺍﻡ ﻭﻳﺠﺐ ﺍﻷﻭﻗﺎﺕ.
�ﻮﻣﻲ(. )ﺑﺸﻜﻞ ﺍﻷﻭﻗﺎﺕ ﺟﻤﻴﻊ ﻓﻲ ﺍﻟﺠﻴﺪ
ﻭﻳﺠﺐ ﺗﻮﻓﻴﺮ ﻣﻨﺎﻃﻖ ﻟﻠﺘﺨ��ﻦ ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻬﺎ.
ﻭﻳﺠﺐ ﺃﻥ ﺗﻜﻮﻥ ﻫﻨﺎﻙ ﺍﺩﺍﺭﺓ ﺟﻴﺪﺓ ﻟﻠﻨﻔﺎﻳﺎﺕ، ﻭﺃﻥ
ﻳﺘﻢ ﺍﻟﺘﺨﻠﺺ ﻣﻦ ﺍﻟﻨﻔﺎﻳﺎﺕ ﺑﺸﻜﻞ ﻣﻨﺘﻈﻢ ﻣﻦ
ﺍﻟﻤﻮﻗﻊ، ﻭﺇزﺍﻟﺔ ﺍﻟﻨﻔﺎﻳﺎﺕ ﺍﻟﻐﺬﺍﺋﻴﺔ ﻣﻦ ﺍﻟﻤﻮﻗﻊ
ﻓﻲ ﺃﻛﻴﺎﺱ ﻣﻐﻠﻘﺔ ﺑﺸﻜﻞ ﻣﻨﺘﻈﻢ.
10
11 All temporary electrical supplies to be in
110 volts. Electrical DBs shall be provided
with RCD and maintained. Cables shall be
protected and safely routed. Industrial
sockets shall be used for cable joints (no
masking tape). Power tools shall be
maintained and workers shall be trained on
the safe use of each tool. Generators shall
be maintained and ground protection shall
be done etc.)
ﻳﺠﺐ ﻟﻜﺎﻓﺔ ﺍﻟﻤﺼﺎﺩﺭ ﺍﻟﻤﺆﻗﺘﺔ ﻟﻠﻜﻬﺮﺑﺎء ﺃﻥ ﺗﻜﻮﻥ
ﺫﺍﺕ ﻓﻮﻟﺘﻴﺔ ﻣﻨﺨﻔﻀﺔ ) 110 ﻓﻮﻟﺖ(، ﻭﺃﻥ ﺗﻜﻮﻥ
ﺑﻘﻮﺍﻃﻊ ﻣزﻭﺩﺓ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻟﺘﻮ��ﻊ ﻟﻮﺣﺎﺕ
ﺍﻟﺤﻤﺎﻳﺔ ﻣﻦ ﺍﻟﺘﻴﺎﺭ ﺍﻟﻤﺘﺒﻘﻲ ﻭﻣﺼﺎﻧﺔ ﺑﺸﻜﻞ ﺟﻴﺪ،
ﻭﺃﻥ ﺗﻜﻮﻥ ﺍﻷﺳﻼﻙ ﻣﺤﻤﻴﺔ ﻭﻣﻤﺪﺩﺓ ﺑﺸﻜﻞ
ﺍﻟﻤﺼﻨﻌﺔ ﺍﻟﻤﻘﺎﺑﺲ ﺍﺳﺘﺨﺪﺍﻡ ﻳﺘﻢ ,ﺍﻥ ﺃﻣﻦ،
ﺍﻟﻜﻬﺮﺑ ﺍﻷﺳﻼﻙ ﻟﺘﻮﺻﻴﻞ ﺍﺳﺘﺨﺪﺍﻡ )ﻳﻤﻨﻊ ﺎﺋﻴﺔ
ﺍﻷﺷﺮﻃﺔ ﺍﻟﻼﺻﻘﺔ(، ﻭﺃﻥ ﻳﺘﻢ ﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻰ
ﻋﻠﻰ ﺍﻟﻌﻤﺎﻝ ﻭﺗﺪ��ﺐ ﺍﻟﻜﻬﺮﺑﺎﺋﻴﺔ ﺍﻷﺩﻭﺍﺕ
ﺍﻻﺳﺘﺨﺪﺍﻡ ﺍﻵﻣﻦ ﻟﻜﻞ ﺃﺩﺍﺓ، ﻭﺃﻥ ﻳﺘﻢ ﺻﻴﺎﻧﺔ
ﻣﻮﻟﺪﺍﺕ ﺍﻟﻜﻬﺮﺑﺎء ﻭﺗﻮﻓﻴﺮ ﺍﻟﺘﺄ��ﺾ ﺍﻟﻤﻨﺎﺳﺐ ﻟﻬﺎ.
11
12 Aluminum or Fiberglass Ladders shall be
used with proper guidance and instructions
(homemade wooden ladders are not
allowed on site). Safe Working Platforms
and Scaffoldings shall be used at all times
with proper platform (min two planks),
double guard rails and safe access. Signage
shall be in place both for safe and unsafe
scaffolding. Edge Protection shall be done
with rigid barriers and maintained.
Temporary staircase shall be placed with
proper hand rails. Excavations shall be
protected with rigid guard rails and
provided with warning signs.
ﻳﺠﺐ ﺃﻥ ﻳﺘﻢ ﺍﺳﺘﺨﺪﺍﻡ ﺳﻼﻟﻢ ﺍﻷﻟﻮﻣﻨﻴﻮﻡ ﺃﻭ
ﺍﻟﻤﻨﺎﺳﺐ ﺍﻟﺘﻮﺟﻴﻪ ﺑﻮﺟﻮﺩ ﺍﻟﻔ�ﺒﺮﺟﻼﺱ
ﺍﻟﺼﻨﻊ ﻳﺪﻭﻳﺔ ﺍﻟﺨﺸ�ﻴﺔ )ﺍﻟﺴﻼﻟﻢ ﻭﺍﻹﺭﺷﺎﺩﺍﺕ
ﻣﻤﻨﻮﻋﺔ ﻓﻲ ﺍﻟﻤﻮﻗﻊ(. ﻭﺃﻥ ﻳﺘﻢ ﻓﻲ ﺟﻤﻴﻊ
ﺍﻷﻭﻗﺎﺕ ﺍﺳﺘﺨﺪﺍﻡ ﻣﻨﺼﺎﺕ ﺍﻟﻌﻤﻞ ﻭﺍﻟﺴﻘﺎﻻﺕ
ﺍﻵﻣﻨﺔ ﺍﻟﻤزﻭﺩﺓ ﺑﻤﻨﺼﺎﺕ ﻣﻨﺎﺳﺒﺔ )ﺑﺤﺪ ﺃﺩﻧﻰ
ﻟﻮﺣﻴﻦ( ﻭﻗﻀﺒﺎﻥ ﺣﻤﺎﻳﺔ ﻣﺰﺩﻭﺟﺔ ﻭﻣﺪﺍﺧﻞ ﺁﻣﻨﺔ.
ﺇﺭﺷﺎﺩﻳﺔ ﻻﻓﺘﺎﺕ ﻫﻨﺎﻙ ﺗﻜﻮﻥ ﻭﺃﻥ ﻣﻦ ﻟﻜﻞ
ﺍﻟﺴﻘﺎﻻﺕ ﺍﻵﻣﻨﺔ ﻭﻏﻴﺮ ﺍﻵﻣﻨﺔ. ﻭﺃﻥ ﺗﻜﻮﻥ ﻫﻨﺎﻙ
ﺣﻤﺎﻳﺔ ﻋﻨﺪ ﺍﻟﺤﻮﺍﻑ ﺑﺎﺳﺘﺨﺪﺍﻡ ﺍﻟﺤﻮﺍﺟﺰ ﺍﻟﺼﻠﺒﺔ
ﻭﺍﻟﻤﺤﺎﻓﻈﺔ ﻋﻠﻴﻬﺎ. ﻭﺃﻥ ﻳﺘﻢ ﺗزﻭﻳﺪ ﺍﻟﺪ�ﺝ ﺍﻟﻤﺆﻗﺖ
ﺑﺪرﺍﺑ��ﻦ ﺟﻴﺪ. ﻭﺃﻥ ﺗﻜﻮﻥ ﺍﻟﺤﻔ��ﺎﺕ ﻣﺤﻤﻴﺔ ﺑﺴﻴﺎﺝ
ﺁﻣﻦ ﺻﻠﺐ ﻣﻊ ﺗﻮﻓﻴﺮ ﻋﻼﻣﺎﺕ ﺗﺤﺬﻳ��ﺔ.
12
13 Any Heavy Plants, Cranes or Lifting
Equipment shall have proper registration
and 3rd party test certificates. Operators
shall have valid training certificates and
licenses.
ﻳﺠﺐ ﻷﻱ ﻣﻌﺪﺍﺕ ﺛﻘﻴﻠﺔ ﺃﻭ رﺍﻓﻌﺎﺕ ﺃﻭ ﻣﻌﺪﺍﺕ
ﻟﻠﺮﻓﻊ ﺃﻥ ﺗﻜﻮﻥ ﻣﺮﺧﺼﺔ ﻭﻟﻬﺎ ﺷﻬﺎﺩﺍﺕ ﻓﺤﺺ ﻣﻦ
ﻃﺮﻑ ﺛﺎﻟﺚ. ﻭﻳﺠﺐ ﺃﻥ ﻳﻜﻮﻥ ﻟﺪﻯ ﺍﻟﻤﺸﻐﻠﻴﻦ
ﺷﻬﺎﺩﺍﺕ ﺗﺪ��ﺐ ﻭﺗرﺍﺧﻴﺺ ﺳﺎ��ﺔ.
13
14 Site and Safety Supervision shall always be
on site throughout the project.
ﻳﺠﺐ ﻋﻠﻰ ﻣﺸﺮﻓﻲ ﺍﻟﻤﻮﻗﻊ ﻭﻣﺸﺮﻓﻲ ﺍﻟﺴﻼﻣﺔ
ﻓﺘﺮﺓ ﻃﻮﺍﻝ ﺍﻟﻤﻮﻗﻊ ً ﻓﻲ ﺩﺍﺋﻤﺎ ﻳﻜﻮﻧﻮﺍ ﺃﻥ
ﺍﻟﻤﺸرﻭﻉ.
14
15 Fatalities & serious Incidents shall be
reported to concerned municipality as per
Mechanism 11.0 – Incident Notification,
Investigation and Reporting.
ﻳﺠﺐ ﺍﻹﺑﻼﻍ ﻋﻦ ﺍﻟﻮﻓﺎﺓ ﻭﺍﻟﺤﻮﺍﺩﺙ ﺣﻮﺍﺩﺙ
ﺍﻟﺨﻄﻴﺮﺓ ﺇﻟﻰ ﺍﻟﺒﻠﺪﻳﺔ ﺍﻟﻤﻌﻨﻴﺔ ﻭﻓﻘﺎ ً ﻟﻶﻟﻴﺔ ﺭﻗﻢ
11 - ﺍﻹﺑﻼﻍ ﻋﻦ ﺍﻟﺤﻮﺍﺩﺙ ﻭﺍﻟﺘﺤﻘﻴﻖ ﻓﻴﻬﺎ ﻭﺭﻓﻊ
ﺍﻟﺘﻘﺎ��ﺮ.
15

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 10 of 14
Minimum OSH Requirements for Small
Projects that Don’t Require OSH Plan or Risk
Assessment
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ ﺍﻷﺩﻧﻰ ﻟﻤﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
ﻟﻠﻤﺸﺎ��ﻊ ﺍﻟﺼﻐﻴﺮﺓ ﺍﻟﺘﻲ ﻻ تﺘﻄﻠﺐ ﺧﻄﺔ ﻟﻠﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ ﺃﻭ ﺗﻘيﻴﻢ ﻟﻠﻤﺨﺎﻃﺮ
The above is in line with requirements of Abu
Dhabi Occupational Safety and Health System
Framework, and further details can be obtained
from: www.adphc.gov.ae (concerning Mechanisms,
Elements, Codes of Practice, etc.).
For more information, please contact the
occupational safety and health office at the
relevant municipality:
ﻣﺎ ﺳﺒﻖ ﻳﺘﻮﺍﻓﻖ ﻣﻊ ﻣﺘﻄﻠﺒﺎﺕ ﺍﻹﻃﺎﺭ ﺍﻟﻌﺎﻡ ﻟﻨﻈﺎﻡ ﺇﻣﺎﺭﺓ
ﻣﻦ ﻭﻟﻠﻤ��ﺪ ﺍﻟﻤﻬﻨﻴﺔ، ﻭﺍﻟﺼﺤﺔ ﻟﻠﺴﻼﻣﺔ ﻇﺒﻲ ﺃﺑﻮ
ﺍﻹﻟﻜﺘرﻭﻧﻲ: ﺍﻟﻤﻮﻗﻊ ��ﺎﺭﺓ ﻳﻤﻜﻨﻜﻢ ﺍﻟﻤﻌﻠﻮﻣﺎﺕ
www.adphc.gov.ae ﺃﺩﻟﺔ ﺍﻟﻌﻨﺎﺻﺮ، ﺍﻵﻟﻴﺎﺕ، )ﺑﺸﺄﻥ
ﺍﻟﻤﻤﺎﺭﺳﺔ ﺍﻟﻔﻨﻴﺔ،ﺍﻟﺦ(
ﻟﻤ��ﺪ ﻣﻦ ﺍﻟﻤﻌﻠﻮﻣﺎﺕ �ﺮﺟﻰ ﺍﻟﺘﻮﺍﺻﻞ ﻣﻊ ﻣﻜﺘﺐ ﺍﻟﺼﺤﺔ
ﻭﺍﻟﺴﻼﻣﺔ ﺍﻟﻤﻬﻨﻴﺔ ﻓﻲ ﺍﻟﺒﻠﺪﻳﺔ ﺍﻟﻤﻌﻨﻴﺔ.
Information of Authorized Signatory: �ﻴﺎﻧﺎﺕ ﺍﻟﻤﺨﻮﻝ ﺑﺎﻟﺘﻮﻗﻴﻊ
ﺍﻻﺳﻢ
Name
ﺧﺘﻢ ﺍﻟﺸﺮﻛﺔ
Stamp
ﺍﻟﺘﻮﻗﻴﻊ
Signature

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 11 of 14
Appendix 3: Occupational Safety and Health (OSH) Requirements for Various
Building Permits
ﻣﺘﺴﻠﺴﻞ
S/N
ﺃﻧﻮﺍﻉ ﺍﻟﺮﺧﺺ
Types of Permits
ﻣﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
OSH Requirements
ﺗﺤﺘﺎﺝ ﻟﺨﻄﺔ
ﺍﻟﺴﻼﻣﺔ
ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ
ﺗﺤﺘﺎﺝ ﻟﺘﻘيﻴﻢ
ﺍﻟﻤﺨﺎﻃﺮ
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ
ﺍﻻﺩﻧﻰ
Requires
OSH Plan
Requires
Risk
Assessment
Minimum OSH
Requirements
1. New building –
Residential ﺭﺧﺼﺔ ﺑﻨﺎء ﺳﻜﻨﻲ ﺟﺪﻳﺪ 
2. New building –
Commercial ﺭﺧﺼﺔ ﺑﻨﺎء ﺟﺪﻳﺪ – ﺗﺠﺎﺭﻱ 
3. New building – industrial ﺭﺧﺼﺔ ﺑﻨﺎء ﺟﺪﻳﺪ – ﺻﻨﺎﻋﻲ 
4. New building –
Institutional ﺭﺧﺼﺔ ﺑﻨﺎء ﺟﺪﻳﺪ – ﻣرﺍﻓﻖ 
5. New building –
Development
ﺭﺧﺼﺔ ﺑﻨﺎء ﺟﺪﻳﺪ – ﺗﻄﻮ�ﺮﻱ
ﺃﻭ ﺍﺳتﺜﻤﺎﺭﻱ 
6. Temporary Building on a
temporary Land – All ﻣﺒﺎﻧﻲ ﻣﺆﻗﺘﺔ ﻷﺭﺽ ﻣﺆﻗﺘﺔ 
7. Demolition – Commercial ﻫﺪﻡ ﻣﺒﻨﻰ ﺗﺠﺎﺭﻱ 
8. Demolition –
Development
ﻫﺪﻡ ﻣﺒﻨﻰ ﺗﻄﻮ�ﺮﻱ ﺃﻭ
ﺍﺳتﺜﻤﺎﺭﻱ 
9. Demolition – industrial ﺭﺧﺼﺔ ﻫﺪﻡ ﻣﺒﻨﻰ ﺻﻨﺎﻋﻲ 
10. Demolition – Institutional ﻫﺪﻡ ﻣﺮﻓﻖ 
11. Demolition – Residential ﻫﺪﻡ ﻣﺒﻨﻰ ﺳﻜﻨﻲ 
12. Deep Foundation – All ﺃﺳﺎﺳﺎﺕ ﻋﻤﻴﻘﺔ 
13. Excavation/Shoring/
Dewatering – All 
14. Chalet a Temporary
Beach Site
ﺷﺎﻟﻴﻪ ﻣﺆﻗﺘﺔ ﻋﻠﻰ ﺷﺎﻃﺊ
ﻣﺆﻗﺖ 
15. Infrastructure Application 
16. Change Contractor ﺗﻐيﻴﺮ ﻣﻘﺎﻭﻝ 
17. Building Addition –
Commercial
ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﺒﻨﺎء ﻋﻠﻰ
ﺃﺭﺽ ﺗﺠﺎ��ﺔ 
18. Building Addition –
Development
ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﺒﻨﺎء ﻓﻲ
ﻣﺸرﻭﻉ ﺗﻄﻮ�ﺮﻱ 
19. Building Addition –
Industrial
ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﺒﻨﺎء ﻋﻠﻰ
ﺃﺭﺽ ﺻﻨﺎﻋﻴﺔ 
20. Building Addition –
Institutional
ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﺒﻨﺎء ﻳﺴﺘﻌﻤﻞ
ﻛﻤرﺍﻓﻖ 
21. Mosque Addition ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﻤﺴﺠﺪ 

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 12 of 14
ﻣﺘﺴﻠﺴﻞ
S/N
ﺃﻧﻮﺍﻉ ﺍﻟﺮﺧﺺ
Types of Permits
ﻣﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
OSH Requirements
ﺗﺤﺘﺎﺝ ﻟﺨﻄﺔ
ﺍﻟﺴﻼﻣﺔ
ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ
ﺗﺤﺘﺎﺝ ﻟﺘﻘيﻴﻢ
ﺍﻟﻤﺨﺎﻃﺮ
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ
ﺍﻻﺩﻧﻰ
Requires
OSH Plan
Requires
Risk
Assessment
Minimum OSH
Requirements
22. Building Repair or
renovation – Commercial
ﺭﺧﺼﺔ ﺻﻴﺎﻧﺔ ﺃﻭ ﺗﺠﺪﻳﺪ ﻟﺒﻨﺎء
ﺗﺠﺎﺭﻱ 
23. Building Repair or
renovation – Industrial
ﺭﺧﺼﺔ ﺻﻴﺎﻧﺔ ﺃﻭ ﺗﺠﺪﻳﺪ ﻟﺒﻨﺎء
ﺻﻨﺎﻋﻲ 
24. Building Repair or
renovation – institutional
ﺭﺧﺼﺔ ﺻﻴﺎﻧﺔ ﺃﻭ ﺗﺠﺪﻳﺪ
ﻟﻤﺮﻓﻖ 
25. Demolition – Fence ﻫﺪﻡ ﺳﻮﺭ 
26. Construction Site
Preparation ﺗﺠﻬﻴﺰ ﺍﻟﻤﻮﻗﻊ 
27. Grading – All ﺃﻋﻤﺎﻝ ﺗﺴﻮﻳﺔ ﻭﺩﻓﺎﻥ 
28. Tower crane (outside the
property lines)
رﺍﻓﻌﺔ ﺑﺮﺟﻴﺔ ﺧﺎ�ﺝ ﺣﺪﻭﺩ
ﺍﻟﻘﺴﻴﻤﺔ 
29. Tower Crane (In property) رﺍﻓﻌﺔ ﺑﺮﺟﻴﺔ ﺩﺍﺧﻞ ﺣﺪﻭﺩ
ﺍﻟﻘﺴﻴﻤﺔ 
30. Building Addition –
Residential ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﺒﻨﺎء ﺳﻜﻨﻲ 
31. Building Addition –
Housing
ﺭﺧﺼﺔ ﺇﺿﺎﻓﺔ ﻟﻤﺴﻜﻦ
ﺷﻌﺒﻲ 
32. Building Repair or
renovation – Residential
ﺭﺧﺼﺔ ﺻﻴﺎﻧﺔ ﺃﻭ ﺗﺠﺪﻳﺪ ﻟﺒﻨﺎء
ﺳﻜﻨﻲ 
33.
Decor or Tenant
Improvement –
Commercial
ﺩﻳﻜﻮﺭ ﺃﻭ ﺗﺠﻬﻴﺰ ﻣﻜﺎ�ﺐ
ﻟﺒﻨﺎء ﺗﺠﺎﺭﻱ 
34. Farm labor compound ﺳﻜﻦ ﻋﻤﺎﻝ ﻓﻲ ﻣزﺭﻋﺔ 
35. Repair or Renovation –
Store
ﺭﺧﺼﺔ ﺻﻴﺎﻧﺔ ﺃﻭ ﺗﺠﺪﻳﺪ
ﻟﻤﺤﻞ ﺗﺠﺎﺭﻱ 
36. Parking Canopy on public
property ﻣﻈﻠﺔ ﺧﺎ�ﺝ ﺣﺪﻭﺩ ﺍﻟﻘﺴﻴﻤﺔ 
37. New Fence on a new land
– All ﺭﺧﺼﺔ ﺑﻨﺎء ﺳﻮﺭ ﺟﺪﻳﺪ 
38. Farm Fence ﺳﻮﺭ ﻣزﺭﻋﺔ 
39. Raising the boundary
wall ﺭﻓﻊ ﺍﻟﺴﻮﺭ – ﺳﻜﻨﻲ 
40. Temporary Fence – All 
41. Structural Modifications
After permit issuance
ﺗﻌﺪﻳﻼﺕ ﺇﻧﺸﺎﺋﻴﺔ ﺑﻌﺪ
ﺍﻟﺘﺮﺧﻴﺺ 
42. Modifications after
permit issuance ﺗﻌﺪﻳﻼﺕ ﺑﻌﺪ ﺍﻟﺘﺮﺧﻴﺺ 

ADOSH-SF – Mechanisms
Mechanism 9.0 – Appointment of Principal Contractor for Construction Work
Version 4.0 –15 th July 2024
Page 13 of 14
ﻣﺘﺴﻠﺴﻞ
S/N
ﺃﻧﻮﺍﻉ ﺍﻟﺮﺧﺺ
Types of Permits
ﻣﺘﻄﻠﺒﺎﺕ ﺍﻟﺴﻼﻣﺔ ﻭﺍﻟﺼﺤﺔ ﺍﻟﻤﻬﻨﻴﺔ
OSH Requirements
ﺗﺤﺘﺎﺝ ﻟﺨﻄﺔ
ﺍﻟﺴﻼﻣﺔ
ﻭﺍﻟﺼﺤﺔ
ﺍﻟﻤﻬﻨﻴﺔ
ﺗﺤﺘﺎﺝ ﻟﺘﻘيﻴﻢ
ﺍﻟﻤﺨﺎﻃﺮ
ﻗﺎﺋﻤﺔ ﺍﻟﺤﺪ
ﺍﻻﺩﻧﻰ
Requires
OSH Plan
Requires
Risk
Assessment
Minimum OSH
Requirements
43.
Modifications without
Exterior Addition -
Commercial
ﺗﻌﺪﻳﻼﺕ ﻣﻦ ﻏﻴﺮ ﺇﺿﺎﻓﺔ
ﺧﺎﺭﺟﻴﺔ ﻟﻤﺒﻨﻰ ﺗﺠﺎﺭﻱ ﻗﺎﺋﻢ 
44.
Modifications without
Exterior Addition –
Development
ﺗﻌﺪﻳﻼﺕ ﻣﻦ ﻏﻴﺮ ﺇﺿﺎﻓﺔ
ﻟﻤﺒﻨﻲ ﺗﻄﻮ�ﺮﻱ ﻗﺎﺋﻢ 
45.
Modifications without
Exterior Addition -
Industrial
ﺗﻌﺪﻳﻼﺕ ﻣﻦ ﻏﻴﺮ ﺇﺿﺎﻓﺔ
ﺧﺎﺭﺟﻴﺔ ﻟﻤﺒﻨﻰ ﺻﻨﺎﻋﻲ
ﻗﺎﺋﻢ

46.
Modifications without
Exterior Addition -
Institutional
ﺗﻌﺪﻳﻼﺕ ﻣﻦ ﻏﻴﺮ ﺇﺿﺎﻓﺔ
ﺧﺎﺭﺟﻴﺔ ﻟﻤﺒﻨﻰ ﻟﻤﺮﻓﻖ ﻗﺎﺋﻢ 
47.
Modifications without
Exterior Addition –
Residential
ﺗﻌﺪﻳﻼﺕ ﻣﻦ ﻏﻴﺮ ﺇﺿﺎﻓﺔ
ﺧﺎﺭﺟﻴﺔ ﻟﻤﺒﻨﻰ ﺳﻜﻨﻲ ﻗﺎﺋﻢ 
48. Canopy for Cars Renewal
(public)
ﺗﺠﺪﻳﺪ ﺭﺧﺼﺔ ﻣﻈﻼﺕ
ﺳﻴﺎرﺍﺕ - ﻋﺎﻡ 
49. Private Property Canopy –
Residential
ﻣﻈﻠﺔ ﺳﻴﺎرﺍﺕ ﺩﺍﺧﻞ ﺣﺪﻭﺩ
ﺍﻟﻘﺴﻴﻤﺔ ﺳﻜﻨﻲ 
50. Temporary Tent on a
Temporary Land
ﺑﻨﺎء ﻣﺆﻗﺖ ﻟﺨﻴﻤﺔ ﻋﻠﻰ
ﺃﺭﺽ ﻣﺆﻗﺘﺔ 
51. Private temporary Tent ﺧﻴﻤﺔ ﻣﺆﻗﺘﺔ ﺩﺍﺧﻞ ﺣﺪﻭﺩ
ﺍﻟﻘﺴﻴﻤﺔ 
52. Short Partitioning – All ﻓﻮﺍﺻﻞ ﻣﻨﺨﻔﻀﺔ – ﻋﺎﻡ 
53. Landscape – All �ﻨﺴﻴﻖ ﻣﻮﻗﻌﻲ – زرﺍﻋﺔ 
54. Demolition Conditional
Permit ﺗﺼ��ﺢ ﻫﺪﻡ ﻣﺸرﻭﻁ 
55. Permit Renewal –
Residential ﺗﺠﺪﻳﺪ ﺍﻟﺘﺮﺧﻴﺺ – ﺳﻜﻨﻲ 
56. Permit Renewal –
Commercial / Institutional
ﺗﺠﺪﻳﺪ ﺍﻟﺘﺮﺧﻴﺺ – ﺗﺠﺎﺭﻱ -
ﻣرﺍﻓﻖ 
57. Permit Renewal –
Development / Industrial
ﺗﺠﺪﻳﺪ ﺍﻟﺘﺮﺧﻴﺺ – ﺗﻄﻮ�ﺮﻱ –
ﺻﻨﺎﻋﻲ 
58. Permit Renewal – Fence ﺗﺠﺪﻳﺪ ﺗﺮﺧﻴﺺ ﻟﺴﻮﺭ 
59. Extend Work Hours ﺗﻤﺪﻳﺪ ﺳﺎﻋﺎﺕ ﺍﻟﻌﻤﻞ ﻓﻲ
ﻣﻮﻗﻊ ﺍﻹﻧﺸﺎء 