Abu Dhabi
Abu Dhabi Ports - Notice to Mariners
121 documents. browse all sources →
Abu Dhabi
EN
Status unverified
2024 · official ↗
What it covers: A Notice to Mariners regarding dredging and development operations at Sas Al Nakhl near Zayed Port, including GPS coordinates marking a restricted work area.
Open document →
Abu Dhabi
EN
Status unverified
2024 · official ↗
What it covers: A Notice to Mariners establishing a designated area or procedure for deep draft vessels. Body text is mostly unrecovered from the source PDF.
Open document →
Abu Dhabi
EN
Status unverified
2024 · official ↗
What it covers: A Notice to Mariners announcing the placement of temporary buoys at the New Freeport to mark a restricted navigation area.
Open document →
Abu Dhabi
EN
Status unverified
2024 · official ↗
What it covers: A Notice to Mariners covering marine development works at Delma Port within the Al Dhafra region ports, identifying a marine work location.
Open document →
Abu Dhabi
EN
Status unverified
02 January 2023 · official ↗
What it covers: Abu Dhabi Ports notice regarding construction works related to the new Musaffah channel and Hudayriyat development, with deployment of aids to navigation (ATON); most body text not machine-readable in the scanned source.
Open document →
Abu Dhabi
EN
Status unverified
03 February 2023 · official ↗
What it covers: Abu Dhabi Ports notice concerning ongoing causeway construction works between Hudayriyat and Musaffah; most body text not machine-readable in the scanned source.
Open document →
Abu Dhabi
EN
Status unverified
09 March 2023 · official ↗
What it covers: Abu Dhabi Ports notice on vessel transit arrangements related to the Hudayriyat-Musaffah causeway works and the reopening of the old Musaffah channel (Khour Al Bateen); most body text not machine-readable.
Open document →
Abu Dhabi
EN
Status unverified
2023-09-21 · official ↗
What it covers: Notice announcing scheduled trials and testing of the remotely operated unmanned vessel 'MARIP 1201' in Musaffah Channel (ICAD II) from 21 September to 9 October 2023, daily 0800-1700.
Open document →
Abu Dhabi
EN
Status unverified
2023 · official ↗
What it covers: A Notice to Mariners announcing the temporary suspension of marine operations at the Old Free Port. The extracted text is mostly image/diagram content with no substantive body text recovered.
Open document →
Abu Dhabi
EN
Status unverified
2023 · official ↗
What it covers: A Notice to Mariners advising of seismic survey operations taking place near Zayed and Musaffah Ports. Extracted text contains mostly formatting artifacts with little body text.
Open document →
Abu Dhabi
EN
Status unverified
08 April 2022 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations in Zayed Port channel and Musaffah outer channel from 10 April to 16 May 2022, temporarily restricting use of the Musaffah short-stay anchorage area.
Open document →
Abu Dhabi
EN
Status unverified
2022-11-02 · official ↗
What it covers: Notice to mariners covering cable laying operations within Mugharraq Port limits; extracted text contained only page markers beyond the header.
Open document →
Abu Dhabi
EN
Status unverified
2022-12-15 · official ↗
What it covers: Notice to mariners covering construction works related to Hudayriyat 1 in the new Musaffah Channel; extracted text contained only page markers beyond the header.
Open document →
Abu Dhabi
EN
Status unverified
07 July 2021 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations near Khalifa Port from 8 July to 10 August 2021, restricting anchoring in the 'A' anchorage area and instructing vessels to maintain caution and monit…
Open document →
Abu Dhabi
EN
Status unverified
26 January 2021 · official ↗
What it covers: Abu Dhabi Ports advises of sea trials and speed/collision-avoidance testing for unmanned autonomous boats in Khawr Al Bazam near Al Mirfa Port from 26 January to 3 February 2021, requesting vessels keep clear of the tria…
Open document →
Abu Dhabi
EN
Status unverified
11 February 2021 · official ↗
What it covers: Abu Dhabi Ports advises that a dredging sinker pipeline will be deployed across Khalifa Port basin at minimum 17.5m depth, marked by yellow and red buoys, as part of ongoing development and expansion works.
Open document →
Abu Dhabi
EN
Status unverified
11 February 2021 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations within Sila Port limits and its southern anchorage area from 15 February to 20 March 2021, restricting anchoring to the northern part of the anchorage…
Open document →
Abu Dhabi
EN
Status unverified
11 February 2021 · official ↗
What it covers: Duplicate of the Sila Port seismic survey notice: offshore ADNOC 3D seismic survey operations within Sila Port limits from 15 February to 20 March 2021, restricting anchoring to the northern part of the anchorage area.
Open document →
Abu Dhabi
EN
Status unverified
07 March 2021 · official ↗
What it covers: Abu Dhabi Ports announces that navigation buoy SB 20 in the Mugharag-Sir Bani Yas channel has been restored to its original position, cancelling the earlier Notice to Mariners No. 09/2020 about the missing buoy.
Open document →
Abu Dhabi
EN
Status unverified
10 March 2021 · official ↗
What it covers: Abu Dhabi Ports announces temporary deployment of four new lateral pillar buoys in the Mugharag-Delma West channel, providing their coordinates and light characteristics.
Open document →
Abu Dhabi
EN
Status unverified
14 March 2021 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations in the northern Zayed Port/Musaffah Port channel and southern anchorage areas from 14 March to 19 April 2021, restricting anchoring to the northern ha…
Open document →
Abu Dhabi
EN
Status unverified
2021-04-20 · official ↗
What it covers: Notice advising mariners of ADNOC 3D seismic survey operations in Musaffah Channel from 20 April to 2 May 2021, requiring vessels to navigate with caution around survey vessels.
Open document →
Abu Dhabi
EN
Status unverified
2021-05-25 · official ↗
What it covers: Notice of a marine survey operation using small boats within Mugharraq Port limits, basin and designated anchorage area from 25-30 May 2021.
Open document →
Abu Dhabi
EN
Status unverified
2021-05-30 · official ↗
What it covers: Notice advising of ADNOC 3D seismic survey operations in Zayed Port and Musaffah Port channels and anchorage areas from 1 June to 5 July 2021, including an anchoring restriction near the survey cables.
Open document →
Abu Dhabi
EN
Status unverified
2021-06-09 · official ↗
What it covers: Notice detailing new measures at Khalifa Port, including a port limits amendment and establishment of a special mark buoy, to enhance safe and efficient one-way vessel traffic in the approach channel.
Open document →
Abu Dhabi
EN
Status unverified
2021-10-10 · official ↗
What it covers: Notice announcing an amendment to Zayed Port limits, revising the boundary west of the navigational channel and south of the Freeport, effective 10 October 2021.
Open document →
Abu Dhabi
EN
Status unverified
2021-11-22 · official ↗
What it covers: Notice updating navigational buoys at Dalma Port, detailing new and removed buoy positions and light characteristics, effective 22 November 2021.
Open document →
Abu Dhabi
EN
Status unverified
2021-12-06 · official ↗
What it covers: Notice reporting that channel buoy ZP 19 was missing and had been replaced by a permanent similar buoy at the same position, urging mariners to navigate with caution.
Open document →
Abu Dhabi
EN
Status unverified
2021-12-12 · official ↗
What it covers: Notice cancelling NTM 14/2021 after missing buoy ZP 19 at Zayed Port channel was found and returned to its position.
Open document →
Abu Dhabi
EN
Status unverified
2021-12-21 · official ↗
What it covers: Notice announcing completion of a new 400m quay wall and dredging of the Mugharraq Port basin and Delma western channel to -8.0m LAT, with new navigation buoys deployed; supersedes NTM 05/2021.
Open document →
Abu Dhabi
EN
Status unverified
2021-12-26 · official ↗
What it covers: Notice advising that M/V Crest Radiant 5 would conduct gravity/magnetic survey and depth measurement in Khalifa Port approach channel and anchorage area from 27 Dec 2021 to 4 Jan 2022, requiring vessels to contact VTS.
Open document →
Abu Dhabi
EN
Status unverified
30 August 2020 · official ↗
What it covers: Amends an earlier notice to extend the effective dates (31 August-20 September 2020) of an offshore ADNOC 3D seismic survey involving up to nine vessels near Khalifa Port's navigation channel; bilingual English/Arabic do…
Open document →
Abu Dhabi
EN
Status unverified
6 August 2020 · official ↗
What it covers: Notifies mariners of offshore ADNOC 3D seismic survey operations near Khalifa Port's navigation channel and anchorage area from 6-31 August 2020, requiring vessels to anchor only in the designated area and contact Khalif…
Open document →
Abu Dhabi
EN
Status unverified
27 March 2020 · official ↗
What it covers: Abu Dhabi Ports notifies mariners of dredging and development works underway in Mugharag Port basin and its western navigation channel, advising vessels to update charts and maintain safe distance from dredgers.
Open document →
Abu Dhabi
EN
Status unverified
07 June 2020 · official ↗
What it covers: Abu Dhabi Ports announces replacement of an existing red port-hand channel beacon (MP 2) with a lateral pillar buoy at the same position and light characteristics in Mugharag Port's north channel.
Open document →
Abu Dhabi
EN
Status unverified
27 March 2020 · official ↗
What it covers: Abu Dhabi Ports notifies mariners of dredging and development works underway in Mugharag Port basin and its western navigation channel, advising vessels to update charts and maintain safe distance from dredgers.
Open document →
Abu Dhabi
EN
Status unverified
07 June 2020 · official ↗
What it covers: Abu Dhabi Ports announces replacement of an existing red port-hand channel beacon (MP 2) with a lateral pillar buoy at the same position and light characteristics in Mugharag Port's north channel.
Open document →
Abu Dhabi
EN
Status unverified
15 June 2020 · official ↗
What it covers: Abu Dhabi Ports advises that Etisalat's cable-laying ship will conduct 24-hour cable deployment and recovery operations at Mugharag Port and approaches from 15-30 June 2020, requiring vessels to keep clear and monitor VH…
Open document →
Abu Dhabi
EN
Status unverified
30 August 2020 · official ↗
What it covers: Abu Dhabi Ports amends its earlier notice to advise of offshore ADNOC 3D seismic survey operations in Khalifa Port's channel and 'B' anchorage area from 31 August to 20 September 2020, restricting anchoring to area 'A'.
Open document →
Abu Dhabi
EN
Status unverified
20 September 2020 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations in the Northern Musaffah Anchorage Area 'S2' from 25 September to 14 October 2020, restricting anchoring to the designated Musaffah anchorage area.
Open document →
Abu Dhabi
EN
Status unverified
05 November 2020 · official ↗
What it covers: Abu Dhabi Ports announces offshore ADNOC 3D seismic survey operations in the southern Zayed Port/Musaffah anchorage areas and Freeport Channel from 8 November to 15 December 2020, restricting anchoring to the northern ha…
Open document →
Abu Dhabi
EN
Status unverified
2020-11-22 · official ↗
What it covers: Notice advising that Mena Plaza Towers would be demolished by controlled explosion on 27 November 2020, requiring vessel relocation and safety precautions in Freeport, New Freeport and Zayed Port.
Open document →
Abu Dhabi
EN
Status unverified
2020 · official ↗
What it covers: An Abu Dhabi Ports circular addressing COVID-19-related precautionary measures for port operations. Body text was not recovered from the source file.
Open document →
Abu Dhabi
EN
Status unverified
10 June 2018 · official ↗
What it covers: Abu Dhabi Ports advises that the Khalifa Port Fairway Buoy (KP-FW) has been permanently relocated to a new position for operational and safety reasons, cancelling the earlier Notice to Mariners No. 03/2013.
Open document →
Abu Dhabi
EN
Status unverified
18 October 2018 · official ↗
What it covers: Abu Dhabi Ports designates a specific Inner Anchorage Area in Western Musaffah (ICAD II Basin) for vessels calling Western Musaffah Terminal, with defined coordinates, draught/LOA restrictions, and VTS anchoring rules.
Open document →
Abu Dhabi
EN
Status unverified
18 October 2018 · official ↗
What it covers: Abu Dhabi Ports designates a specific Inner Anchorage Area in Western Musaffah (ICAD II Basin) for vessels calling Western Musaffah Terminal, with defined coordinates, draught/LOA restrictions, and VTS anchoring rules.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 03/2017 · 3 April 2017 · official ↗
What it covers: Establishes an additional short-stay anchorage area within Musaffah Port limits, defined by specific coordinates, to enhance navigational safety and efficiency for vessels frequently using the channel.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 06/2017 · 19 November 2017 · official ↗
What it covers: Notifies mariners that three navigation buoys (S-27, S-29, S-31) in the Sas Al Nakhl Channel at Zayed Port have been permanently relocated to new coordinates, with no change to buoy shapes or characteristics.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 03/2017 · 3 April 2017 · official ↗
What it covers: Establishes an additional short-stay anchorage area within Musaffah Port limits, defined by specific coordinates, to enhance navigational safety and efficiency for vessels frequently using the channel.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 06/2017 · 19 November 2017 · official ↗
What it covers: Notifies mariners that three navigation buoys (S-27, S-29, S-31) in the Sas Al Nakhl Channel at Zayed Port have been permanently relocated to new coordinates, with no change to buoy shapes or characteristics.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 04/2012 · official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
2012-2013 · official ↗
What it covers: Chart update notice detailing depth and legend amendments for Admiralty Charts 3713 and 3715 (Mina Zayed and approaches), based on dredging surveys, sourced from Abu Dhabi Ports Company.
Open document →
Abu Dhabi
EN
Status unverified
No. tice No. 04/2011 · January 2011 · official ↗
What it covers: Comprehensive Abu Dhabi Ports Company byelaws issued under the Transport Regulations (General and Port Operations) 2010, covering harbour master powers, vessel reporting, pilotage, port operations, safety, security, envi…
Open document →
Abu Dhabi
EN
Status unverified
2010 · official ↗
What it covers: Sets out compulsory pilotage rules, pilot boarding stations, ETA/ETD notification requirements, and conditions for obtaining Pilotage Exemption Certificates (PEC) at Khalifa Port.
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Abu Dhabi
EN
Status unverified
official ↗
What it covers: (could not extract - file contains no readable OCR text, only page markers)
Open document →
Load more (61)